Done for you · Tender & bid programmes

A tender programme that wins the bid.

Send us the tender documents and scope. Experienced planners return a fully logic-linked CPM programme, submission-ready in Oracle Primavera P6, MS Project or PDF. Fast turnaround for tight tender deadlines.

Tender programme pack SUBMISSION-READY
Fully logic-linked CPM network
Critical path & key milestones
Resource-loaded & levelled
Aligned to your method statement
DCMA-checked schedule quality
Primavera P6 .xer MS Project .mpp PDF
What you get

A submission-ready programme that survives scrutiny.

48–72 h turnaround Revisions included
Logic-linked CPM

Every activity driven by real predecessors and successors, no open ends, a clean continuous critical path.

Native P6 / MS Project

Delivered in the exact format the tender specifies, Oracle Primavera P6 (.xer), Microsoft Project (.mpp) or PDF.

Method-statement aligned

Sequencing that matches your construction methodology, so the programme and the technical bid tell one story.

Resource-loaded & levelled

Realistic crews and durations, levelled to remove overallocations that a reviewer would flag.

DCMA-checked quality

Run against the DCMA 14-point checks, so logic, float, leads/lags and constraints stand up to the assessor.

Ready for award

Win the job and the tender programme becomes your baseline, no rebuild, ready for progress and claims.

How it works

From tender documents to a winning programme.

1 DAY 0
Send tender docs

Scope, drawings, BOQ, ITT or a rough plan, plus the required format and the submission date.

2 48–72 H
We build & check

A planner builds the logic-linked CPM programme; our engines validate the critical path and DCMA quality.

3 SUBMIT
You submit

Programme back in your required format with a revision pass included. Win the bid and it becomes your baseline.

What we prepare

Tender, bid & baseline programmes.

Pre-tender programmes, bid programmes, target and baseline programmes, resource-loaded and levelled, ready for the submission pack. You get the programme; we don't do the works.

Building & construction
MEP & electromechanical
Infrastructure & civils
Shutdowns & outages
Oil, gas & process
Data centres & fit-out
Planners behind major projects
Snowy Hydro 2.0 Sadara Chemical CMC Hospital Nobu Hotel Almarai Milk Plants, KSA

Won the job? We can keep managing the schedule to completion, updates, re-forecasts and look-aheads, with private AI optimising along the way.

Aligned with PMI AI Guide Australia & Middle East
Tender programme FAQ

Questions planners and bid teams ask.

Can you prepare a construction programme for a tender?

Yes. Send us the tender documents, scope, drawings or BOQ and our planners build a fully logic-linked CPM programme, submission-ready in Oracle Primavera P6, Microsoft Project or PDF.

How fast can you turn around a tender programme?

We work to your tender deadline. A typical baseline tender programme is delivered within 48 to 72 hours of receiving your scope; urgent submissions can be faster, just tell us the date.

Do you deliver in Primavera P6 or Microsoft Project?

Both. You receive the native file the tender requires, an Oracle Primavera P6 .xer or a Microsoft Project .mpp, plus a clean PDF for the submission pack.

What's the difference between a baseline and a tender programme?

A tender (or pre-tender) programme demonstrates a credible, logic-linked plan to win the bid. Once awarded, it becomes the baseline programme against which progress and any delay or extension-of-time claims are measured.

Is our tender information kept confidential?

Yes. Your data is private, encrypted, never used to train public AI models, and can be deleted on demand. NDAs are available on request.

Send your tender docs

Tell us about the tender.

Give us the scope and the submission date. We'll come back with how we'd programme it and what it would cost. Goes straight to [email protected], reply within 24 hours.

Attach scope, drawings, BOQ or the ITT. Your email app will open, so add the files there before sending.
EMAIL
[email protected]

Send your tender docs and we'll respond within 24 hours.

YOU GET
A submission-ready programme

Logic-linked CPM, in Oracle Primavera P6, MS Project or PDF. Your choice of format.

COVERAGE
Construction · MEP · infrastructure

Shutdowns, oil & gas, data centres and fit-out across Australia and the Middle East.

Tender due this week?

Send us the scope and the submission date today, and get a submission-ready programme back, faster and cheaper than the conventional way.